This project was set to a tight timescale and budget, with just 10 months to finish the construction of all 14 houses once the main project had begun. The works also included the reconstruction of the road outside of the site to bring it up to adoptable standards and the construction of a robust drainage system adequate enough to handle heavy rainfall of the local area and divert it out into the surface water ditch.
BBL obtained all the necessary design approvals and carefully managed the project throughout, keeping to a tight programme, whilst maintaining a good friendly relationship with the local residents and ensuring that our site met the standards of the Considerate Constructors Scheme. In doing so, we achieved a Certificate of Performance from Premier for the high quality product delivered.
The project was completed on time and handed over to a high quality standard to the delight of Moat Housing. Where they were extremely pleased and moved residents in the following day.