New Project Alert!
Our Structural Works Team have commenced strip-out and enabling works at our latest project in South East London.
Over the next three months, the team will focus on:
- Basement excavation to prepare for structural modifications.
- Defect rectification to address existing structural vulnerabilities.
- Installation of a cavity drain membrane tanking system
Stay tuned for updates as we transform this space into a safe and functional area for our client’s home!